Scope to consider
- Design-input and drawing coordination
- Inspection and test plan coordination
- Material and document traceability requirements
PROJECT COORDINATION
Connect the commercial scope with the engineering requirements. Establish the drawing register, inspection requirements and document deliverables before release, with project-specific responsibilities agreed between all parties.
Coordination scope is agreed per project. Independent design certification and product compliance must come from the responsible qualified parties.
Final specifications, standards, materials and acceptance criteria must be tied to an approved project configuration.
